Method of manufacturing armature coil

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10644556
APP PUB NO 20170324291A1
SERIAL NO

15639090

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is in an armature coil formed by arranging a plurality of coil conductors on a lower metal die having a tapered groove that is narrower toward an inner side. The coils are pressed using an upper metal die having an end portion narrower than the width of the groove. The coils are formed in a substantially trapezoidal shape which gets narrower toward the radially inner side and the cross-sectional areas of the plurality of the coil conductors in the slot are each substantially the same and the circumferential width thereof is formed narrower as the coil conductor is arranged toward the radially inner side; and one coil conductor is formed in a convex shape and another coil conductor is formed in a concave shape along the convex shape.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doi, Issei Tokyo, JP 5 24
Kawasaki, Sachiko Tokyo, JP 20 183
Matsuo, Hiroyuki Tokyo, JP 93 977
Mori, Akihiko Tokyo, JP 56 491
Nishimura, Yasukazu Tokyo, JP 7 44
Tamura, Koji Tokyo, JP 55 417
Tamura, Shuichi Tokyo, JP 90 857
Yamamura, Akihiro Tokyo, JP 76 681

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00