Assembly for connecting a non-structural bulkhead to the structure of a ship, and method for the installation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10035562
APP PUB NO 20170327187A1
SERIAL NO

15525881

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A floating connection assembly of a bulkhead to at least one element of constraint includes a projection integral to the element of constraint and at least one first longitudinal sealing bead. At least one projecting element protrudes from the bulkhead. The assembly has at least a second flexible seal and at least one closure plate, arranged in such a way that the bulkhead and the element of constraint are separated along an edge of the bulkhead. The one first longitudinal sealing bead is interposed between the bulkhead and the projection, on which is present at least one through hole through which passes the projecting element, integral with a respective closure plate, so that the bulkhead remains cantilevered on the protrusion, avoiding a different support, and so that the projecting element is free to oscillate inside the hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CENTRO PER GLI STUDI DI TECNICA NAVALE—CENTENA S.P.A.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Codda, Matteo Genoa, IT 2 2
De, Luca Gaetano Genoa, IT 1 0
Pullara, Andrea Genoa, IT 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 31, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 31, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00