Water faucet device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10060107
APP PUB NO 20170328047A1
SERIAL NO

15529912

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automatic water faucet device 1 includes: an electrolysis tank 37 that electrolyzes water to generate electrolyzed water; a second water discharge part 13 for discharging the electrolyzed water, a second flow path 18 that extends from the electrolysis tank 37 to the second water discharge part 13; a second solenoid valve 28 that switches between supply and blocking of normal water with respect to the electrolysis tank 37, and a controller 40 that controls the electrolysis tank 37 and the second solenoid valve 28. The controller 40 energizes the electrolysis tank 37 to discharge the electrolyzed water and thereafter stops the energization of the electrolysis tank 37 and maintains an open state of the second solenoid valve 28, to stop the supply of the electrolyzed water to the second flow path 18 and to supply normal water to the second flow path 18.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOTO LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanashiro, Masanobu Kitakyushu, JP 10 28
Mizoguchi, Hiroshi Kitakyushu, JP 21 492
Murata, Kensuke Kitakyushu, JP 15 123
Nakao, Hitoshi Kitakyushu, JP 11 114
Tomiyama, Naoto Kitakyushu, JP 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00