Expanding a tubular element in a wellbore

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10450845
APP PUB NO 20170328185A1
SERIAL NO

15529409

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for radially expanding a tubular element (2) in an underground borehole (3) comprises an expansion string (16) extending into the tubular element (2) and including an expander (27) and a jack device (24) for pulling the expander (27) through the tubular element (2) so as to radially expand the tubular element (2). The jack device (24) is provided with an anchor (28) having at least one slip element (50) adapted to be radially moved against the inner surface of the tubular element (2). A cage (14) is positioned above the tubular element (2), which cage (14) is surrounded by a cylindrical wall and adapted to receive the anchor (28) and to be radially expanded by the anchor (28) against said cylindrical wall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHELL OIL COMPANYP O BOX 576 HOUSTON TX 77001-0576

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bouma, Remmelt Joure, NL 3 0
Van, Dalfsen Erik Joure, NL 2 0
Van, Der Zee Tino Walter Joure, NL 15 63
Wubben, Antonius Leonardus Maria Rijswijk, NL 26 153

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00