Control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10208804
APP PUB NO 20170328413A1
SERIAL NO

15526825

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device (10′) comprises a control unit (10′) with a control element for controlling a fluid flow and being rotatable about a first axis (13) between an open position and a closed position, and a separate motor-driven actuator unit (24), which is mechanically coupled to said control unit (10′) to rotate said control element about said first axis (13) in a controllable fashion, whereby said actuator unit (24) comprises a driving part (25) with a driving element (31) being rotatable about a second axis (26), to be mechanically coupled to said control element in a coupling position to rotate said control element about said first axis (13), and a control part (28) for driving said driving element (31) in a controllable fashion. Said driving element (31) is removably coupled to said control unit (10′) by means of a spur gearing (Hirth serration) (22, 29).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BELIMO HOLDING AGBRUNNENBACHSTRASSE 1 HINWIL 8340

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bamberger, Georg Winterthur, CH 4 37
Niederhauser, Urs Pfungen, CH 10 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00