Triboelectric generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10770990
APP PUB NO 20170331396A1
SERIAL NO

15589091

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A triboelectric generator includes a first electrode and a second electrode spaced apart from each other, a first charging part on the first electrode, a second charging part on the second electrode, and a grounding unit. The first charging part and the second charging part may be configured to contact each other through a sliding motion. The grounding unit may be configured to intermittently connect a charge reservoir to the second charging part. The grounding unit may be configured to vary the electric potential of the second charging part so as to amplify current flowing between electrodes of the triboelectric generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIST (ULSAN NATIONAL INSTITUTE OF SCIENCE AND TECHNOLOGY)ULSAN 44919

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baik, Jeongmin Ulsan, KR 4 44
Byun, Kyungeun Seongnam-si, KR 11 96
Kim, Jaeyoung Suwon-si, KR 183 1536
Kim, Kyeongnam Jeju-si, KR 2 15
Lee, Jaewon Gangneung-si, KR 99 512
Lee, Jinpyo Gongju-si, KR 2 15
Seol, Minsu Suwon-si, KR 59 133
Shin, Hyeonjin Suwon-si, KR 182 642
Yang, Woojung Incheon, KR 2 15
Ye, Byeonguk Daegu, KR 4 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 8, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00