Butadiene production system and butadiene production method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10065902
APP PUB NO 20170334805A1
SERIAL NO

15531120

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A butadiene production system and a butadiene production method are provided in which the yield is high and environmental load can be reduced. The butadiene production system (1) includes: a gas preparation device (10) that heats raw materials to prepare a mixed gas including hydrogen and carbon monoxide; an ethanol production device (12) that is provided downstream of the gas preparation device (10) and brings the mixed gas into contact with a first catalyst to obtain ethanol; a butadiene production device (16) that is provided downstream of the ethanol production device (12) and brings the ethanol into contact with a second catalyst to obtain butadiene; and return means (18) for returning hydrogen, ethylene, and the like, which are produced as by-products in the butadiene production device (16), to the gas preparation device (10). In addition, in the butadiene production method, the butadiene production system (1) is used.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEKISUI CHEMICAL CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koma, Satoshi Tokyo, JP 10 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00