Coating liquid for forming piezoelectric thin film, method of producing coating liquid for forming piezoelectric thin film, piezoelectric thin film, method of manufacturing piezoelectric thin film, and liquid ejection head

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10865311
APP PUB NO 20170335111A1
SERIAL NO

15493426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a coating liquid for forming a piezoelectric thin film containing lead zirconate titanate, the coating liquid including a complex precursor containing at least three kinds of metal elements of Pb, Ti, and Zr, the coating liquid being free from an exothermic peak at a temperature of 450° C. or more, or having a heat generation amount at a temperature of from 400° C. to 450° C., which is larger than a heat generation amount at a temperature of from 450° C. to 500° C., in differential thermal analysis of the coating liquid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHAJAPAN
FUJI CHEMICAL CO LTD3-2-33 HIGASHINODA-CHO MIYAKOJIMA-KU OSAKA-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kobayashi, Motokazu Yokohama, JP 69 234
Koketsu, Naoyuki Komae, JP 25 55
Nakasu, Minako Tokyo, JP 33 953
Shimizu, Chiemi Hirakata, JP 18 104
Uchida, Fumio Daito, JP 30 196

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00