Method for operating a construction laser

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9921061
SERIAL NO

15159994

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for operating a construction laser by means of a remote controller, which has an input field, for initiating an action of the construction laser, wherein the remote control unit contains a sensor for determining a change in a parameter of the remote control unit, and the change in the parameter influences the at least one action, wherein the parameter is a parameter from the group comprising position, tilt, and movement of the remote control unit, and the action is an action or one operating mode from the group comprising rotational speed of the laser head, cross-sectional mode, mask mode, scan mode, tilt of the plane spanned by the particularly rotating laser beam, and point mode. To enable easy handling, following activation of the input field, the action is initiated only when the degree of change in the parameter of the remote control unit has reached a threshold value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • STABILA MESSGERATE GUSTAV ULLRICH GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Weber, Andreas Wilgartswiesen, DE 189 1453

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00