Connecting arrangement between joint partners in the chassis region of a vehicle that can be braced separably against one another

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11002307
APP PUB NO 20170343031A1
SERIAL NO

15679358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connecting arrangement is provided between joining partners which are braced separably against each other in the chassis region of a vehicle, wherein the joining partners are braced against each other via their contact surfaces by at least one releasable fastening element. Hard particles are applied to the contact surface at least of one of the joining partners before the production of the connecting arrangement and therefore before the bracing mounting of the joining partners and of the fastening element. The hard particles at least partially project into the respectively other contact surface as a result of the bracing mounting. The hard particles are applied so as to be at least approximately abrasion-proof, for example by a blasting process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bui, Hoang Viet Munich, DE 5 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 11, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00