Connection joints from 3-phase to single-phase on modular metering main bus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10613125
SERIAL NO

15165879

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A 3-phase group modular metering system, with a 3-phase four main cross bus A, B, C and N configuration is provided to distribute 3-phase four wire power to a single-phase three main cross bus A1, B1 and N1 configuration as single-phase three wire power. The system comprises a 3-phase main connection module, at least one or more single-phase in to single-phase out metering module stacks, a number of 3-phase metering module stacks ranging from as few as none to as many as a plurality and a connection joint. The connection joint is disposed between a last 3-phase module and the at least one or more single-phase in to single-phase out metering module stacks to derive the 3-phase four main cross bus A, B, C and N configuration into the single-phase three main cross bus of A1, B1 and N1 configuration. The connection joint distributes power in single-phase through the single-phase three main cross bus of A1, B1 and N1 configuration by deriving (A, B, N) or (A, C, N) or (B, C, N) combination of a 3-phase bus and forming single-phase connection interfaces.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIEMENS INDUSTRY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rusch, Brian J Suwanee, US 24 160
Shumate, Arthur Kevin Duluth, US 14 92
Zhang, Fan Suwanee, US 880 6238

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00