Method for producing composite body of lithium titanate particles and carbonaceous material, and composite body of lithium titanate particles and carbonaceous material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10665360
APP PUB NO 20170346131A1
SERIAL NO

15535824

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a production method that enables the production of a composite body of lithium titanate particles and a carbonaceous material, the composite body having excellent electrical characteristics and so on, and the composite body of lithium titanate particles and a carbonaceous material. A method for producing a composite body of lithium titanate particles and a carbonaceous material includes the steps of: preparing a raw material mixture using a titanium compound, a lithium compound, and an oligomer and/or raw material monomer of an alkali-soluble resin; and subjecting the raw material mixture to heat treatment under a non-oxidizing atmosphere to produce the composite body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OTSUKA CHEMICAL CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iuchi, Hirotoshi Tokushima, JP 1 0
Nakagawa, Taiji Tokushima, JP 10 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 26, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00