Vehicle speed-change system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10711891
APP PUB NO 20170350506A1
SERIAL NO

15592454

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a vehicle speed-change system including the following: a transmission positioned to the rear of a crank shaft of an engine; a transmission case that retains the transmission; a shift mechanism that has a shift cam which performs a speed-change operation of the transmission; and a shift actuator that operates the shift cam. The transmission includes a counter shaft positioned to the rear of the crank shaft, and a drive shaft to which rotation of the counter shaft is transmitted. The shift cam is positioned further to the rear than the counter shaft, and the shift actuator is arranged in a rear portion of the transmission case and to the rear of the shift cam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUZUKI MOTOR CORPORATIONHAMAMATSU-SHI SHIZUOKA 432-8611

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasegawa, Kei Hamamatsu, JP 20 135
Tanaka, Koichi Hamamatsu, JP 412 4179

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 14, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00