Valve operation booster

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10210977
APP PUB NO 20170352461A1
SERIAL NO

15173568

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power converter module is connected to an electrical power supply and is configured to generate a first voltage and a second voltage for controlling operation of a valve, where the valve includes a solenoid for affecting opening and closing of the valve. The first voltage is a boost voltage for accelerating opening of the valve. The second voltage is a holding voltage for maintaining the valve in an open state. A boost control module is configured to control supply of the first voltage to the solenoid of the valve in accordance with a first state of an opening boost control signal when a valve control signal directs opening of the valve, and is configured to control supply of the second voltage to the solenoid of the valve in accordance with a second state of the opening boost control signal when the valve control signal directs opening of the valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LAM RESEARCH CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pelkey, Devon Tualatin, US 2 7
Rudolph, Dirk Dundee, US 11 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00