Apparatus and method for encoding with cyclic redundancy check and polar code

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10361718
APP PUB NO 20170353193A1
SERIAL NO

15611725

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a pre-5th-Generation (5G) or 5G communication system to be provided for supporting higher data rates Beyond 4th-Generation (4G) communication system such as Long Term Evolution (LTE). An operation method of a receiving device in a wireless system includes receiving a polar codeword generated by a polar code, generating a majority of decoding paths by decoding a bit value corresponding to one index that is selected among a majority of indexes indicating respective bits included in the polar codeword, determining a first candidate group that includes at least one decoding path among the majority of decoding paths, and determining, as a second candidate group, at least one decoding path passing a CRC check among the first candidate group. A number of the at least one decoding path included in the first candidate group is determined based on a result of a CRC check performed prior to the CRC check.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO
RESEARCH & BUSINESS FOUNDATION SUNGKYUNKWAN UNIVERSITYSUWON-SI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baek, Eun Chong Suwon-si, KR 2 25
Chung, Min Young Seoul, KR 17 152
Hwang, Wonjun Suwon-si, KR 42 317
Jang, Min Seongnam-si, KR 125 944
Kim, Jong-Hwan Suwon-si, KR 127 3286
Kim, Sang-Hyo Seongnam-si, KR 47 852
Ryu, Hyunseok Yongin-si, KR 304 1777

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00