Method for operating an electronic safety system with temporary participants

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10662027
APP PUB NO 20170355559A1
SERIAL NO

15536815

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for operating a safety system having a control unit, a bus, a plurality of bus nodes connected to the control unit via the bus, and a plurality of participants connected to the control unit via the bus nodes, wherein at least one participant is designated as a temporary participant. The method includes the step of logging the temporary participant out of the safety system by giving notice of a disconnection of the temporary participant from the safety system by a manipulation and disconnecting the temporary participant from the safety system. The safety system can be used with an elevator system for carrying out the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INVENTIO AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hess, Martin Baar, CH 74 5763
Lustenberger, Ivo Buttisholz, CH 21 72
Sonnenmoser, Astrid Hochdorf, CH 36 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 26, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00