Systems and methods for electrically testing electromigration in an electromigration test structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10161994
APP PUB NO 20170356957A1
SERIAL NO

15181909

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for electrically testing electromigration in an electromigration test structure are disclosed herein. The systems include a voltage control portion, a current control portion, and a current regulating structure. The systems further include an electric current detector, a first system connection, and a second system connection. The systems also include a voltage detector, and a controller. In some embodiments of the methods, a voltage control portion regulates a high-side signal electric current to maintain a voltage difference below a voltage setpoint while a current control portion maintains the high-side signal electric current below a threshold current value. In some embodiments of the methods, one of the voltage difference and a magnitude of the high-side signal electric current is selected as a primary control parameter while the other is selected as a compliant control parameter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FORMFACTOR BEAVERTON, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Donlin, James J Cottage Grove, US 1 0
Harry, Brent Dale White Bear Lake, US 1 0
McMullen, Timothy Allen Lino Lakes, US 2 2
Wilcox, Eric James Andover, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00