Splitting scheduling system and method thereof for integrating heterogeneous network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10645715
SERIAL NO

15367746

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A splitting scheduling system and method thereof for integrating heterogeneous network is provided. The system includes one or multiple wireless router, a mobile network core system, and a heterogeneous network router. When an external terminal device is located in a service covering range of the heterogeneous network router and the wireless router and the terminal device has a heterogeneous network integrating access condition, then the heterogeneous network router enables the terminal device to communicate with heterogeneous network router and the wireless router in the same time. The system further assigns a downlink traffic splitting ration to the terminal device according to individual communication status of the wireless router and the heterogeneous network router so as to provide a better communication quality.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHUNGHWA TELECOM CO LTDNO 99 DIANYAN RD YANGMEI DIST TAOYUAN CITY 326

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Chia-Horng Yangmei, TW 5 61
Tsou, Yao-Chun Yangmei, TW 2 1
Wang, Chung-Ho Yangmei, TW 5 143
Wang, Po-Hsueh Yangmei, TW 2 1
Wu, Sz-Hsien Yangmei, TW 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00