Actuating conveyor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10647520
APP PUB NO 20170362036A1
SERIAL NO

15622784

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method which comprises determining first geometry information of a first object stream of a plurality of objects, which are transported on a first conveyor. The method also comprises determining second geometry information of a second object stream of a plurality of objects which are transported on a second conveyor. The first conveyor is configured to transport objects at a first speed, and the second conveyor is configured to transport objects at a second speed. The first conveyor and the second conveyor are arranged in such a way that the objects which are transported by the first conveyor move onto the second conveyor. The method also comprises adjusting the first speed of the first conveyor and/or adjusting the second speed of the second conveyor on the basis of the determined first geometry information and/or the determined second geometry information.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRANSNORM SYSTEM GMBH31177 HARSUM
DEUTSCHE POST AGBONN GERMANY BONN NORTH RHINE-WESTPHALIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Özyigit, Ali Bonn, DE 7 23
Hartmann, Bernd Grafschaft-Leimersdorf, DE 83 773
Schällig, René Hildesheim, DE 4 28
Ventz, Kai-Ulrich Hildesheim, DE 4 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00