Oil filled gage reference side protection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10247632
APP PUB NO 20170370795A1
SERIAL NO

15191074

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressure sensor can include a housing having a sense side cavity formed on a first side of the housing; a sense side diaphragm attached to the first side and over the sense side cavity, a sense die assembly placed in the cavity and attached to the housing; a reference side cavity formed in the housing, a reference side diaphragm attached to a second side of the housing and over the reference side cavity, and pin(s) electrically connected to the sense die assembly and extending outside the housing from the second side. The cavities are filled with oil. Manufacturing the pressure sensor can include mounting the sense die assembly onto the housing, attaching the sense side diaphragm to the first side of the housing, filling the cavities with oil, and attaching the reference side diaphragm on the second side of the housing and over the reference side cavity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONEYWELL INTERNATIONAL INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bradley, Alistair David Hilliard, US 12 112
Eckhardt, Todd Westerville, US 24 308
Jones, Ryan Dublin, US 74 1279

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00