Automatic transfer switch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9935495
SERIAL NO

15191847

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Automatic transfer switch for switching an electrical load between two power sources. In one example, the automatic transfer switch includes four latching relays and an electronic controller. A first power source line connection is connected to an electrical load line connection via a first latching relay. A first power source neutral connection is connected to an electrical load neutral connection via a second latching relay. A second power source line connection is connected to the electrical load line connection via a third latching relay. A second power source neutral connection is connected to the electrical load neutral connection via a fourth latching relay. The electronic controller connects the second power source to the electrical load when a voltage of the first power source is less than a first threshold, and connects the first power source to the electrical load when the voltage is greater than a second threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ELECTRONIC THEATRE CONTROLS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burke, Kevin Madison, US 27 199
Thurk, John Fitchburg, US 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00