Vehicle and manufacturing method for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10259408
APP PUB NO 20180001851A1
SERIAL NO

15634083

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle includes a vehicle body, a tire held by the vehicle body, an electric power control unit including at least one of an inverter and a converter, a case housing the electric power control unit, a first predetermined member connected to the vehicle body in an insulated state, a self-discharge static eliminator configured to reduce the positive potential of the first predetermined member by elimination of static electricity, and a transfer member electrically connecting a first connecting portion and a second connecting portion to each other. Accordingly, static electricity charged to the electric power control unit is transferred to a portion, where static elimination is performed by the self-discharge static eliminator, of the first predetermined member via the case and the transfer member so as to be neutralized and eliminated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • C/O TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tanahashi, Toshio Susono, JP 117 1851
Yamada, Koshi Odawara, JP 24 223

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00