Touch panel and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10209549
APP PUB NO 20180004027A1
SERIAL NO

15392288

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a touch panel includes the following steps. A plurality of first sensing electrodes and a plurality of second sensing electrodes are formed on the first substrate. A first insulator layer is formed to cover the first sensing electrodes and the second sensing electrodes. Holes are formed in the first insulator layer, in which a portion of the first sensing electrodes is exposed through the holes. A conductive layer is formed on the first insulator layer and in the holes. The conductive layer is patterned to form a bridge electrode and a shield electrode. The bridge electrode is electrically connected to the first sensing electrodes through the holes. A vertical projection of the shield electrode on the first substrate at least overlaps with a vertical projection of at least one of the first sensing electrodes and the second sensing electrodes on the first substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AU OPTRONICS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chien, Yu-Feng Hsin-Chu, TW 60 661
Lin, Wei-Lin Hsin-Chu, TW 7 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00