Control device of inverter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9985553
SERIAL NO

15543140

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device (2) of an inverter converts electrical power generated by a solar cell (3) into alternating current power connecting to an electric power system (7). The control device includes: an alternating current voltage sensor (14) sensing a system voltage (Vr) of the electric power system; an MPPT executer (23) controlling a direct current voltage (Vdc) applied to the inverter (1) to cause the electrical power output from the solar cell (3) to be a maximum when the direct current voltage (Vdc) is higher than a lower limit (VL); a direct current voltage lower limit calculator 22 reducing the lower limit (VL) when the system voltage (Vr) is lower than a predetermined voltage; and an electrical power controller (25) controlling reactive power based on the system voltage (Vr), the reactive power being output from the inverter (1).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MITSUBISHI—ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ambo, Tatsuaki Chuo, JP 19 168
Matsuoka, Yuji Chuo, JP 19 156

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00