Energy harvester using triboelectricity and apparatus including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10931209
APP PUB NO 20180006582A1
SERIAL NO

15378577

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Example embodiments relate to an energy harvester using triboelectricity, and to an apparatus including the energy harvester. The energy harvester may include a first structure having a first triboelectric material, a second structure having a second triboelectric material, and a closed structure isolating friction surfaces of the first and second triboelectric materials from external environment. The energy harvester may further include a filling material in the closed structure. The filling material may have an electric charge. The filling material may have a viscosity. At least a portion of the closed structure may include an elastic material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byun, Kyungeun Seongnam-si, KR 11 96
Jung, Alum Suwon-si, KR 19 61
Kim, Jae-Young Suwon-si, KR 116 766
Shin, Hyeonjin Suwon-si, KR 182 642

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 23, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00