De-icing apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10610875
SERIAL NO

15714843

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Illustrative processes remove ice buildup in containers or other locations by melting the ice using a de-ice component. Waste fluid may be removed using a vacuum component. The de-ice component causes discharge of pressurized fluid to melt ice. The de-ice component may include a base with guide features configured to engage an opening of the container. The de-ice component may direct a spray of the pressurized fluid into the container to melt the ice. The de-ice component may include a pressure regulator valve to selectively regulate a resulting force of the fluid sprayed into the container, which may enable a user to avoid damaging internal components located within the container. The vacuum component may cause the pressurized fluid to flow through a high pressure nozzle to create a vacuum effect at a suction inlet, which can extract waste fluid and/or other debris from the container.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GACKSTETTER CAMERON EFAIRBANKS AK

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gackstetter, Cameron E Fairbanks, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00