Topology of converter power supplies in electrical climate compressors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11415351
APP PUB NO 20180017302A1
SERIAL NO

15648138

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an electric compressor control device comprising a low-voltage domain. The low-voltage domain comprises a first control unit set up to process control commands for the control of the electric compressor, and a first voltage supply set up to supply the first control unit and connected to a low-voltage source. The low-voltage domain comprises furthermore a high-voltage domain. The high-voltage domain comprises a second control unit set up to control a power output stage, wherein the power output state inverts a dc voltage from a high-voltage source into an ac voltage in order to supply a motor of the electric compressor with the ac voltage. The high-voltage domain comprises furthermore a second voltage supply set up to supply the second control unit and connected to the high-voltage source.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HANON SYSTEMS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Karutz, Philipp Cologne, DE 3 2
Newton, Stephen Ann Arbor, US 10 3
Werker, Stephan Merzenich-Golzheim, DE 22 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00