Hybrid vehicle driving system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10675962
APP PUB NO 20180022202A1
SERIAL NO

15546360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid vehicle driving system includes: a generator; a motor; a case which accommodates the generator and the motor; and a power control unit for controlling the generator and the motor, the generator and the motor being disposed side by side on a same axis within the case. The power control unit is mounted on the case by connecting a unit-side generator connector and a unit-side motor connector which are provided on a bottom surface of the power control unit with a case-side generator connector and a case-side motor connector which are disposed on the case, directly and respectively. The case is fixed to a vehicle framework member via a mount member, and a fixing point where the case and the mount member are fixed together is disposed near the case-side generator connector and the case-side motor connector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aiba, Tsukasa Wako, JP 15 222
Fukuda, Takashi Wako, JP 166 1352
Hagimoto, Takahiro Wako, JP 10 49
Katou, Hidetoshi Wako, JP 3 16
Masuda, Jun Tokyo, JP 20 69
Saika, Hitoshi Wako, JP 3 46
Takei, Hiroshi Wako, JP 33 398
Urabe, Eiichirou Wako, JP 1 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 9, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00