Transmission control device for automatic transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10288168
APP PUB NO 20180023693A1
SERIAL NO

15546513

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A corner determinator detects a corner appearing in a traveling direction of a vehicle and determines whether a detected corner is a blind corner based upon a current position of the vehicle and road data. A blind distance calculator calculates a distance from the determined blind corner to the vehicle based upon the current position of the vehicle and the road data. A necessary engine braking amount calculator calculates, on the basis of a calculated distance, a necessary engine braking amount necessary for decelerating a current vehicle speed to a vehicle speed at which it is possible to stop around the blind corner when a braking operation is performed with a full braking amount. A required speed change stage determinator calculates a required speed change stage based upon the determined necessary engine braking amount. A transmission controller performs a downshift to a determined required speed change stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noguchi, Tomoyuki Wako, JP 46 268

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00