Air conditioner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10088175
APP PUB NO 20180023820A1
SERIAL NO

15368920

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioner is provided that may include a main body having an air inlet and an air outlet defined therein; a filter received in the main body to filter air suctioned into the main body; a heat exchanger configured to perform a heat exchange between a refrigerant and the air suctioned into the main body; and an ultraviolet (UV) sterilization module configured to sterilize the air suctioned into the main body. The UV sterilization module may include a porous main body in a mesh form, and a plurality of UV lamps. The porous main body may include a bent portion to allow the porous main body to conform to a shape of the heat exchanger. The main body may include a chassis, and a front frame at a front of the chassis. An inner space may be defined between the chassis and the front frame. The porous main body may be coupled to at least one of the chassis or the front frame, and the plurality of UV lamps may be arranged to be spaced from each other between the air inlet and the heat exchanger.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG ELECTRONICS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joung, Jaeyoul Seoul, KR 3 17
Kim, Gyoungsoo Seoul, KR 4 25
Kim, Taeyoung Seoul, KR 213 1687

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00