Virtual machine migration using a prediction algorithm

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10248450
APP PUB NO 20180024856A1
SERIAL NO

15652697

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A virtual machine control device includes a processor configured to acquire usage information including an actual usage value of respective virtual machines operating on each of information processing apparatuses during each of past periods, and create, for each of the information processing apparatuses, prediction information including a prediction usage value of the respective virtual machines during each of periods. The processor is configured to determine, upon detecting a first virtual machine whose actual usage value is not included in the usage information, whether a first period exists, in which a sum of the actual usage value of the first virtual machine and prediction usage values of virtual machines operating on a first apparatus exceeds a criterion. The processor is configured to issue, upon determining that the first period exists, an instruction to move one of virtual machines operating on the first apparatus to a second apparatus before the first period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJITSU LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sumida, Hiroki Mishima, JP 7 63
Yoshimoto, Yasuo Numazu, JP 8 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00