Multilayer ceramic capacitor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10818438
APP PUB NO 20180025844A1
SERIAL NO

15653227

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment, a multilayer ceramic capacitor 10 has supplementary dielectric layers 11d, each having a first cover part 11d1 that covers the space between two first base conductor films 11c on each of both height-direction faces, and second cover parts 11d2 that connect to the first cover part 11d1 and also cover parts of the first base conductor films 11c, respectively, in the length direction. External electrodes 12, 13 each have a second base conductor film 12a, 13a attached to a one length-direction face and to one length-direction edges of two first base conductor films 11c on the respective height-direction faces, and a surface conductor film 12b, 13b attached continuously to the surface of the second base conductor film 12a, 13a and also to the parts of the surfaces of the two first base conductor films 11c not covered by the second cover parts 11d2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIYO YUDEN CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iijima, Yoshiaki Takasaki, JP 17 104
Sasaki, Takashi Takasaki, JP 737 6957
Sato, So Takasaki, JP 12 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 27, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00