Connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10256569
APP PUB NO 20180026396A1
SERIAL NO

15651859

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A backlash elimination structure of a connector includes a first contact point of a detection member contacting a first target sliding portion of a housing in a temporary locked state release operation direction of a detection member between a temporary locking position and a main locking position of the detection member, and a second contact point contacting a second target sliding portion of the housing in a direction opposite to the release operation direction therebetween. The first contact point and the second contact point are disposed to be displaced from each other in a relative movement direction of the detection member. The detection member includes a base body which is separated from a wall portion, a wall body which connects the base body and the first contact point to each other, and a first target locking body which is disposed to be separated from the wall portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • YAZAKI -CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohtaka, Kazuto Shizuoka, JP 81 892

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00