Apparatus and method for separating solids from a solids laden drilling fluid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10799817
APP PUB NO 20180028947A1
SERIAL NO

15725799

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for separating solids from solids laden drilling fluid is provided. The apparatus includes a shale shaker and a screen assembly. The shale shaker includes a base and a basket isolated from the base, a flow tray arranged in the basket for directing screened drilling fluid. The screen assembly includes at least one layer of screening material, a screen support having a perimeter with at least one support point within the perimeter, wherein the flow tray includes at least one raised portion to support the screen assembly. In some versions the shale shaker has a basket having side supports and at least one intermediate support arranged between the side supports. The screen assembly includes a screen support supporting at least one layer of screening material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NATIONAL OILWELL VARCO L.P.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burnett, George Alexander Warlingham, GB 39 734

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 13, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00