High-frequency wave supplying structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9957610
SERIAL NO

15647305

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-frequency wave supplying structure includes a center conductor that extends in a specified direction, an outer conductor that is coaxial with the center conductor and grounded, and a cylindrical insulating member that is provided between the center conductor and the outer conductor. The distal end of the center conductor is a support portion that supports a workpiece W. A shield member is provided outward of the outer conductor to be coaxial with the outer conductor and the center conductor. The distal end of the shield member is located closer to the support portion in the specified direction than the distal end of the outer conductor. The insulating member includes a protruding portion that protrudes toward the support portion from an opening of the outer conductor. The protruding portion is opposed to the distal end of the outer conductor in the specified direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • C/O TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakata, Hiromichi Toyota, JP 25 156
Sato, Takayasu Takahama, JP 18 67
Sato, Yoji Kasugai, JP 49 359
Tachibana, Kazutaka Nagoya, JP 20 217
Tsuboi, Daiki Nishikasugai, JP 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00