Hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10329737
APP PUB NO 20180030690A1
SERIAL NO

15552829

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An output command calculating section (40) of an HCU (36) restricts a battery discharge power from an electricity storage device (31) based upon a battery electricity storage rate (SOC) and a current square integrating rate (Risc) of the electricity storage device (31). Thereby, the HCU (36) transfers from a normal mode (NMODE) to a low speed mode (LSMODE) to lower a movement speed of a hydraulic actuator. A monitor display amount calculating section (50) of the HCU (36) calculates a maximum speed reduction rate (DRs) based upon a battery discharge power limit value (Plim0) and an engine output upper limit value (Pemax) from the output command calculating section (40). A monitor device (39) displays a reduction rate of the movement speed of the hydraulic actuator in the low speed mode (LSMODE) based on the maximum speed reduction rate (DRs).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI CONSTRUCTION MACHINERY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hita, Masafumi Tsuchiura, JP 17 26
Imura, Shinya Toride, JP 125 630
Nishikawa, Shinji Kasumigaura, JP 80 623

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00