Controller for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10281040
APP PUB NO 20180031126A1
SERIAL NO

15653344

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When an engagement-side clutch taking charge of rotation control in a downshift is the same as a rotation control clutch in the previous gear shift or a clutch of which the engagement has been switched in the previous gear shift, there is a likelihood that clutch hydraulic controllability will decrease and the clutch hydraulic controllability is secured by delaying start of the gear shift. It is possible to execute a gear shift which is a downshift without unnecessary waiting by setting a delay time by which the start of the gear shift is delayed depending on an accelerator depression amount such that the delay time is shorter when the accelerator depression amount is small than when the accelerator depression amount is large.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 501 TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asami, Tomohiro Nisshin, JP 41 153
Ota, Keisuke Toyota, JP 86 656
Tsukamoto, Norihiro Toyota, JP 24 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00