Refrigerator and basket assembly thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10197327
APP PUB NO 20180031309A1
SERIAL NO

15662542

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refrigerator and a basket assembly thereof are disclosed. The basket assembly includes a basket, a cover for covering the basket, a knob provided at the basket, and a protruding portion provided at the cover and fastened to the knob. The knob includes a first extension portion extending from the basket in an upwardly inclined direction to a higher position than a distal end of the protruding portion so as to support a rear surface of the protruding portion, a second extension portion extending from the first extension portion in a downwardly inclined direction, and a third extension portion extending downwards from the second extension portion. When force is applied to the third extension portion in a forward direction, the first extension portion is elastically deformed such that the distal end of the first extension portion is moved to a lower position than the distal end of the protruding portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG ELECTRONICS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Minhoon Seoul, KR 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00