Power source control method, power source control apparatus, and storage medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10275015
APP PUB NO 20180032123A1
SERIAL NO

15626665

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power source control executed by a processor includes setting a plurality of period candidates indicating candidates of a predetermined period; calculating, for each of a plurality of nodes, an average interval of idle periods in which a procedure is not executed for each of the plurality of period candidates, based on operation record information indicating history of procedures; calculating an amount of reduction of power consumption with respect to each of the plurality of period candidates based on the calculated average interval and an amount of power consumption in the idle period; selecting a period that is allocated to each of the plurality of nodes from among the plurality of period candidates based on the calculated amount of reduction; and executing, for each of the plurality of nodes, control to set the power source to an off state when the idle period becomes the selected period or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJITSU LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imade, Hiroaki Kawasaki, JP 4 7
Moroo, Jun Isehara, JP 35 431

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00