Bicycle control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10183721
APP PUB NO 20180043962A1
SERIAL NO

15233370

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle control device is basically provided with a mounting bracket, a hydraulic unit and a shift unit. The mounting bracket includes a handlebar clamp defining a handlebar mounting axis. The hydraulic unit is provided on the mounting bracket and includes a cylinder housing defining a cylinder bore, a hydraulic reservoir and a piston. The hydraulic reservoir is fluidly connected to the cylinder bore. The piston is movably disposed in the cylinder bore along a cylinder axis of the cylinder bore. The shift unit is provided on the mounting bracket and includes a wire take-up member pivotable about a take-up axis. The wire take-up member of the shift unit and the hydraulic reservoir are disposed between the handlebar mounting axis and the cylinder axis as viewed along a first direction parallel to the take-up axis of the wire take-up member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHIMANO COMPONENTS (MALAYSIA) SDN. BHD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ng, Chee Keong Johor, MY 4 8
Ng, Sui Cheng Johor, MY 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 22, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 22, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00