Modifying cementitious compositions using ketone alcohol oil waste

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10752549
APP PUB NO 20180044240A1
SERIAL NO

15553996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to modification of hydratable cement and cementitious materials, such as mortar cement and masonry or ready-mix concrete using ketone alcohol oil waste (“KAOW”) material, obtained as an alkali-soluble liquor waste byproduct at a certain stage in the commercial production of cyclohexanol and cyclohexanone. Preferred applications for KAOW are in chemical admixture formulations whereby KAOW is used to substitute for a portion of a cement dispersant such as sodium lignosulfonate, sodium gluconate, or other conventional dispersant. Another preferred use is in mortar cement and masonry concrete units such as blocks, pavers, curbstones, and other concrete masonry units wherein air void systems advantageously foster freeze-thaw durability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GCP APPLIED TECH INCNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chun, Byong-wa Waban, US 26 618
Hnin, Yin-Zar Singapore, SG 1 0
Jachimowicz, Felek Brookline, US 26 372
Lai, Wee Fuk Singapore, SG 3 0
Zhang, Shuqiang Singapore, SG 16 316
Zhong, Hua Singapore, SG 93 506

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00