Process and apparatus for making a hydrophobized fiber cement product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10300625
APP PUB NO 20180050466A1
SERIAL NO

15556196

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to processes and apparatuses for producing hydrophobized fiber cement sheets as well as fiber cement sheets obtainable therewith. In particular, the present invention provides processes for manufacturing a hydrophobized fiber cement product, said process at least comprising the steps of: (i) forming at least one fiber cement film on a rotating sieve in contact with a fiber cement slurry in a vat; (ii) transferring said at least one fiber cement film from said sieve to a felt transport belt, (iii) applying a mist of a hydrophobizing agent to said at least one fiber cement film, and (iv) accumulating the fiber cement film on an accumulator roll via the felt transport belt, so as to form a hydrophobized fiber cement product. The present invention further relates to various uses of the fiber cement sheets obtainable by the processes of the invention in the building industry.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ETERNIT GMBH69126 HEIDELBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beermann, Mario Oelde, DE 1 0
Orlowski, Michael Oelde, DE 14 282
Reintjes, Frank Ennigerloh, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00