Two-component polyurethane adhesive for adhesively bonding molded fiber parts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10851272
APP PUB NO 20180051196A1
SERIAL NO

15613535

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a two-component polyurethane adhesive containing i) a polyol component including a mixture of three different polyols to ensure crosslinking for a mechanically stable adhesive bonding, and also to achieve hydrophobia to ensure that the crosslinked adhesive layer is impervious to moisture, and glass fibers, and ii) an isocyanate component containing polyisocyanates in an NCO/OH ratio of 0.9:1 to 1.5:1. The polyol component further includes a metal catalyst. The two-component adhesive has a high adhesive strength, a high glass temperature, a low curing time and a sufficiently long processing time, which can adhesively bond also substrates having uneven surfaces. The invention further relates to an article comprising the two-component polyurethane adhesive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HENKEL AG & CO KGAA40589 DÜSSELDORF

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jurkschat, Klaus Dortmund, DE 4 26
Pölitz, Silvana Erkrath, DE 1 2
Thiele, Lothar Langenfeld, DE 18 125
Zöller, Thomas Essen, DE 9 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00