Semiconductor device and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10332877
APP PUB NO 20180053761A1
SERIAL NO

15242591

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method of a semiconductor device includes the following steps. A semiconductor substrate including at least one fin structure is provided. A gate material layer is formed on the semiconductor substrate, and the fin structure is covered by the gate material layer. A trench is formed partly in the gate material layer and partly in the fin structure. An isolation structure is formed partly in the trench and partly outside the trench. At least one gate structure is formed straddling the fin structure by patterning the gate material layer after the step of forming the isolation structure. A top surface of the isolation structure is higher than a top surface of the gate structure in a vertical direction for enhancing the isolation performance of the isolation structure. A sidewall spacer is formed on sidewalls of the isolation structure, and there is no gate structure formed on the isolation structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UNITED MICROELECTRONICS CORP.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liou, En-Chiuan Tainan, TW 155 692
Tung, Yu-Cheng Kaohsiung, TW 225 1046
Yang, Chih-Wei Kaohsiung, TW 113 1043

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00