Solar cell module and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10672942
APP PUB NO 20180053876A1
SERIAL NO

15557324

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a solar cell module is obtained that allows a wiring material to be wired by a highly productive wiring method when a solar cell module is formed by arranging the wiring material on an electrode of a solar cell. The method for producing a solar cell module includes preparing a plurality of solar cells having an electrode on at least one of a first main surface and a second main surface, arranging the plurality of solar cells so that the first main surfaces of the plurality of solar cells face roughly in the same direction, connecting the linear conductor for electrically connecting one of the electrode on the first main surface and the electrode on the second main surface of each solar cell with one continuous linear conductor, and electrically disconnecting the continuous linear conductor after the connecting the linear conductor so that the electrodes of at least one pair of adjacent solar cells among the plurality of solar cells are connected in series.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAMICS CORPORATIONNIIGATA-SHI NIIGATA 950-3131

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iida, Hideyo Niigata, JP 21 186

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00