Battery optimization control system with data fusion systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10778012
APP PUB NO 20180054061A1
SERIAL NO

15663496

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optimization controller for a battery includes a high level controller configured to receive a regulation signal from an incentive provider at a data fusion module, determine statistics of the regulation signal, and use the statistics of the regulation signal to generate a frequency response midpoint. The optimization controller further includes a low level controller configured to use the frequency response midpoint to determine optimal battery power setpoints and use the optimal battery power setpoints to control an amount of electric power stored or discharged from the battery during a frequency response period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CON EDISON BATTERY STORAGE, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dorneanu, Radu Greendale, US 4 88
Drees, Kirk H Cedarburg, US 172 7755
Elbsat, Mohammad N Milwaukee, US 115 2180
Przybylski, Andrew J Franksville, US 38 318
Wenzel, Michael J Oak Creek, US 198 5448

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 15, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00