Method for producing forged crankshaft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10441995
APP PUB NO 20180056372A1
SERIAL NO

15560504

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosed production method includes a die forging step of obtaining a forged blank with flash having a crankshaft shape, and a trimming step of removing the flash from the forged blank while nipping the forged blank with a pair of holding dies. In the forged blank, at least one of the rough crank arms have, in a region near an adjacent rough pin, a first excess portion protruding from an outer periphery of a side portion of the rough crank arm. When the forged blank is nipped with the pair of holding dies, the first excess portion is deformed by the pair of holding dies to bulge toward an adjacent rough journal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishihara, Koichiro Kyoto, JP 24 525
Kurokawa, Hiroyuki Nishinomiya, JP 85 1011
Okubo, Junichi Amagasaki, JP 29 34
Takamoto, Sho Osaka, JP 10 4
Tamura, Kenji Takatsuki, JP 134 1171
Yabuno, Kunihiro Matsubara, JP 21 14
Yamashita, Tomohisa Suita, JP 31 274
Yoshino, Ken Guangdong, CN 30 234

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00