Method for producing metal member

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10618130
APP PUB NO 20180056438A1
SERIAL NO

15560311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The method includes a step of preparing a first member made of a first metal and a second member made of a second metal having a smaller deformation resistance than the first metal, and a step of joining the first member and the second member. The step of joining includes a step of heating the first member and the second member by relatively rotating the first member and the second member, while pressing the first member and the second member against each other, without changing a relative positional relationship therebetween, and a step of cooling the first member and the second member heated, while being pressed against each other. In a first contact surface which is a surface of the first member coming into contact with the second member, a recess is formed so as to include a region intersecting the axis of rotation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOMATSU LTD2-3-6 AKASAKA MINATO-KU TOKYO 107-8414

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amano, Masaharu Hirakata, JP 32 220
Matsuyama, Toshikazu Hirakata, JP 12 34
Shibata, Yoshitaka Hirakata, JP 21 204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00