Rope and method for producing a rope

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10760212
APP PUB NO 20180058003A1
SERIAL NO

15555254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a rope, wherein fiber bundles are applied with a liquefied matrix material upstream of and/or at a twisting point to form fiber strands, and are embedded into the liquefied matrix material during stranding, by which fiber strands a fiber core of the rope is formed and wires or wire strands are wound about the fiber core. The matrix material of the fiber strands is hardened after the stranding, and the fiber strands are subsequently stranded directly with one another without further application to form the fiber core. Preferably the fiber strands are heated, during or after the stranding thereof to form the fiber core, so that the matrix material softens at least individual of the fiber strands, preferably all the fiber strands, softens and connects with the matrix material of another of the fiber strands, and is subsequently hardened, forming an integral bond with one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WIRECO GERMANY GMBHCASARSTRASSE 1 KIRKEL 66459

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lauer, Bruno Marpingen, DE 5 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00