Refrigerant recovery in natural gas liquefaction processes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10788260
APP PUB NO 20180058752A1
SERIAL NO

15671622

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein is a method of removing refrigerant from a natural gas liquefaction system in which vaporized mixed refrigerant is withdrawn from the closed-loop refrigeration circuit and introduced into a distillation column so as to be separated into an overhead vapor enriched in methane and a bottoms liquid enriched in heavier components. Overhead vapor is withdrawn from the distillation column to form a methane enriched stream that is removed from the liquefaction system, and bottoms liquid is reintroduced from the distillation column into the closed-loop refrigeration circuit. Also described are methods of altering the rate of production in a natural gas liquefaction system in which refrigerant is removed as described above, and a natural gas liquefaction systems in which such methods can be carried out.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HERCULES PROJECT COMPANY LLC1209 ORANGE STREET WILMINGTON DE 19801

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Johnston, Brian Keith Schnecksville, US 5 14
Krishnamurthy, Gowri Sellersville, US 35 108
Roberts, Mark Julian Kempton, US 75 934

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00